Continuous Emission Monitoring Systems (CEMS)

CEMS Calibration, Quality Assurance and Maintenance

How a CEMS stays accurate and compliant after commissioning: the functional test, QAL2 calibration, QAL3 drift checks and the annual surveillance test, with maintenance, spare parts and on-site support from LKS.

Technician inspecting an emission analyzer probe on an industrial stack

A CEMS is only as useful as the data it reports. After installation, the Department of Environment's CEMS guidelines set a sequence of quality assurance steps that prove the system measures correctly, and keep proving it for as long as the source operates.

The quality assurance cycle

StepWhenPurpose
Functional testAfter installation, and as the first part of each ASTChecks alignment and cleanliness, the sampling train, and documentation and records
QAL2 calibration and variability test (QAL2-CVT)Within 6 months of commissioning, then at least every 3 yearsCalibrates the CEMS against parallel reference measurements
QAL3 ongoing performance monitoringContinuously, by the plant operatorTracks zero and span drift so faults are found early
Annual surveillance test (AST)Every yearConfirms that the calibration is still valid and variability is within limits

A new QAL2 is also required after a CEMS failure or a repair that changes the results significantly, after a change of fuel, after a significant change in plant operation, or when the QAL3 checks or the AST show it is needed. Plants firing biomass, whose fuel varies from batch to batch, may need a QAL2 every year in place of the AST.

Annual surveillance test

The AST starts with a functional test and continues with at least five parallel measurements against the standard reference method, spread over the measuring day, each at least one hour apart and sampled for at least 30 minutes. The results confirm whether the existing calibration function still holds.

Reporting obligations

  • Results of the yearly evaluation of the continuous monitoring are submitted to DOE within three months after the end of each calendar year, and kept for at least three years
  • Excess emissions are reported to DOE within 24 hours of discovery
  • Failure of a monitoring device is reported to DOE within one hour

How LKS supports your CEMS

LKS supports each system it supplies through its working life. On request, our engineers carry out preventive maintenance and site visits, prepare the CEMS for its functional test, QAL2 and AST, troubleshoot analyzer and sampling faults, and supply spare parts such as heated gas sampling probes (heated to 180 °C, in SS316Ti stainless steel) and compressor sample gas coolers. See the CEMS solution page for complete systems, or contact our team to arrange a service visit or a maintenance contract.

FAQ

Common questions.

All questions
What is QAL2 and how often is it needed?

QAL2 is the calibration and variability test that calibrates a CEMS against parallel reference measurements. It is needed within six months of commissioning, at least every three years after that, and again after major repairs, fuel changes or significant process changes.

What is the annual surveillance test (AST)?

A yearly check that the CEMS calibration is still valid: a functional test followed by at least five parallel reference measurements spread over the measuring day.

What must be reported if a CEMS fails?

The failure of a monitoring device must be reported to DOE within one hour, and an excess emission within 24 hours of its discovery.

Read next

Related topics.

  1. CEMS for Power Plants01

    CEMS for Power Plants

    Continuous emission monitoring system (CEMS) for power plant boilers and combustion turbines above 10 MWe, combining extractive and in-situ gas analysers with a particulate analyser to measure SO2, NO2, CO and total PM.Read more
  2. CEMS for Cement Plants02

    CEMS for Cement Plants

    Continuous emission monitoring system (CEMS) for cement kilns and related non-metallic sources, combining extractive and in-situ gas analysers with a particulate in-situ analyser to measure SO2, NO2 and total PM/dust against DOE emission limits.Read more
  3. CEMS for Oil and Gas Facilities03

    CEMS for Oil and Gas: Refineries and Natural Gas Facilities

    Continuous emission monitoring system (CEMS) for oil and gas refineries and natural gas processing and storage facilities, combining extractive and in-situ gas analysers with a particulate analyser to measure SO2 and total PM.Read more
  4. Palm Oil04

    CEMS for Palm Oil Mills

    Continuous emission monitoring system (CEMS) for palm oil mills, combining extractive gas analyzers, in-situ gas analyzers and particulate in-situ analyzers to measure total PM/dust and opacity, with data sent to the DOE server.Read more
  5. CEMS for Waste Incinerators05

    CEMS for Waste Incinerators

    Continuous emission monitoring system (CEMS) for waste incinerators of all sizes, combining extractive and in-situ gas analysers with an in-situ particulate analyser to measure total PM, NMVOC, HCl, HF, SO2, NO2 and CO against DOE emission limits.Read more
  6. CEMS for Iron and Steel Mills06

    CEMS for Iron and Steel Mills (Ferrous Metals)

    Continuous emission monitoring system for iron and steel mills, combining extractive gas analysers, in-situ gas analysers and in-situ particulate analysers to measure SO2, NO2 and total PM from sinter plants, coke ovens and furnaces.Read more

Lifecycle support

Installed, calibrated and maintained.

With more than two decades in valves and instrumentation across a diverse range of industries, we keep instruments accurate and valves healthy, because valve health management is vital for plant safety.

  • Installation & commissioning
  • Calibration & testing
  • Maintenance & overhaul
  • Dismantling & replacement

Get in touch

Need a quote or technical advice?

Tell us about your application and our engineers will recommend the right instrument or system.

  1. 01Share your applicationProcess, medium, range and site conditions.
  2. 02Engineer recommendationWe match the right instrument or system to your process.
  3. 03Quotation and supportSupply, installation, calibration and after-sales service.