Case study
SCADA integration at STP 2 Biogas Plant
Integration of the existing plant system onto SCADA, with wireless stations and a three-tier monitoring system.
Project scope
- Integration of the existing system onto SCADA
- Wireless devices at 6 stations
- Main PLC in the server room
System at a glance
- 6 wireless stations
- 1 main PLC
- 3-tier monitoring